UL Fire-Rated Doors for UAE and Gulf Projects
UL listed steel fire-door assemblies supplied from China for contractors, fit-out companies, distributors and project buyers working across the UAE and wider Gulf.
SJ DOORS supplies UL listed steel fire-door assemblies from China for UAE and Gulf projects. Each quotation is checked against the door schedule, wall construction, required fire rating, hardware and destination. UL listing is product evidence; UAE Civil Defence or other local approval requirements must be confirmed by the project team.
A complete listed assembly for the opening.
The leaf, frame and listed hardware are reviewed together. The quotation can include fire-rated glazing, finish, labels, packing and export documentation for the approved door schedule.
- UL listed steel fire-door assemblies with 20 to 120 minute ratings
- Door leaf, labelled frame and listed hardware schedule
- Powder coating, wood grain transfer and project finish samples
- Fire-rated glazing where vision panels or glazed openings are required
- Export packing and shipments to the nominated UAE or Gulf port
View the complete fire-rated door product page for the technical specification.

What to send before pricing.
A fire-door quotation is only reliable when the assembly and project requirements are clear.
Door schedule
Opening references, sizes, handing, quantity and required fire rating for each location.
Assembly details
Wall construction, frame type, glazing, hardware schedule, finish and any acoustic or smoke requirements.
Approval route
Destination, consultant requirements and the Civil Defence or local authority submission expected for the project.
Product evidence is not the same as local approval.
UL listing provides evidence for the listed door assembly, but the project team must confirm whether the UAE authority having jurisdiction requires Civil Defence product registration, consultant submission, testing, labelling or another approval route. We will provide the available listing information for the quoted model and identify what still needs to be handled locally before the order is placed.
This avoids quoting a door that meets a generic description but cannot be accepted for the actual opening, building or emirate.
Fire-door questions before ordering.
Can you supply UL fire-rated doors to UAE projects?
Yes. We supply UL listed steel fire-door assemblies from China for UAE and wider Gulf projects, including the door leaf, frame, listed hardware and export packing. The quotation is prepared from the project door schedule.
Are the doors automatically approved by UAE Civil Defence?
No. A UL listing is product evidence, but local acceptance can require Civil Defence submission, product registration, consultant review or contractor approval. The project team must confirm the authority-having-jurisdiction requirements before ordering.
Which fire ratings are available?
Assemblies can be reviewed at 20, 45, 60, 90 and 120 minute ratings. The required rating, door type, frame and hardware schedule must match the approved project specification.
Can glazing and hardware be included?
Fire-rated glazing can be included where required and is supplied with its own listing. Listed hinges, locksets and other hardware are confirmed against the approved hardware schedule.
Can we inspect the factory before ordering?
Factory visits in Foshan are available by appointment, and live video inspection can be arranged when travel is not possible.
What should we send for a UAE fire-door quotation?
Send the door schedule, opening sizes, wall construction, required rating, handing, hardware schedule, glazing, finish, quantity and destination. If a consultant or Civil Defence submission is required, include the applicable specification and approval route.
Continue reviewing the project.
Send the UAE door schedule and approval requirements.
Share the product type, dimensions, quantity, destination and target timeline. We review the opening sizes, configuration, glass, hardware and delivery requirements before preparing a quotation.